Mezzanine Planning for Metro Detroit Operations
    Free-Standing Mezzanine with steel framing and upper working level

    Free-Standing Mezzanines in Detroit, MI

    Your lease may stay the same while the operation needs more room. A free-standing mezzanine adds a level supported by its own steel columns, without attaching to the building roof or walls. It can make space for parts, packing or offices while leaving the building structure independent.

    Tenants in Troy, Auburn Hills and Livonia often need to adapt industrial or R&D space within the footprint they already occupy. Detroit Mezzanines plans the platform around that use, with the possibility of another bay or a future relocation considered before the frame is ordered.

    (888) 553-7276

    An Independent Level Inside an Existing Building

    Columns, beams, joists and decking form an independent frame, bolted together and anchored to the floor. Stairs and material gates connect the levels. Plan it around the work beneath, rather than drawing a platform in isolation.

    In older buildings being reused in Detroit and Madison Heights, usable height can be the first constraint. Manufacturing spaces in these areas include 14–24 ft clear buildings. We measure the actual space around overhead obstructions and the work below before suggesting where an upper level can go.

    A leased plant also needs a plan for occupied rooms. Cold winters and humid summers in mostly non-air-conditioned Metro Detroit facilities mean an office or break room needs real heating and cooling. Those rooms affect the layout, access and usable height; they are not simply boxes to place wherever the steel fits.

    A bolted platform can be dismantled, but its next location needs to accommodate the height, footprint, loads and access. Keep component information for that review; relocation is a planned project, not an automatic fit.

    What Independence Leaves Open for a Tenant

    Keep the roof and walls separate

    The new level relies on its own steel frame. A tenant can add working area within the shell while keeping the deck independent of the roof and walls.

    Leave space for a later bay

    Discuss another parts area or packing line before selecting support spacing. Reserve room for future access rather than placing a stair where an extension might need to go.

    Consider a move before buying

    A removable structure offers another option at lease end. Evaluate disassembly, transport and the new arrangement to identify which components can carry over.

    Preserve the work beneath

    Keep production benches, receiving doors and travel lanes on the drawing. Moving a task upstairs should not create a new ground-level bottleneck during shift changes.

    Frame and Access Decisions

    Support
    Independent steel columns; anchored to the floor
    Footprint
    Planned around existing work and available clear height
    Deck rating
    Selected for stored inventory, workstations and rolling loads
    Surface choices
    ResinDek panels, coated panels, steel tread plate or open grating
    Access
    Stairs, handrail and material gates arranged with the frame
    Schedule
    Reviewed after layout, fabrication scope and site access are agreed

    Work That Can Fit a Separate Level

    • Tenants adding parts storage within their present lease
    • Kitting benches above an existing work area
    • Returns processing separated from outbound packing
    • Enclosed supervisor rooms with planned heating and cooling
    • Operations considering expansion or relocation

    New Components and Parent-Company Experience

    We provide new bolt-together platforms with surfaces and access selected for the intended work. Detroit Mezzanines is backed by Warehouse Equipment & Supplies Co., in business since 1997.

    From Lease Priorities to Assembly

    1

    Discuss the lease

    Explain the work you want upstairs and any anticipated building move. We begin with the limits and priorities you already know.

    2

    Measure the space

    Review clear height, columns, doors and handling paths. Identify the area that must remain available below the proposed level.

    3

    Compare arrangements

    A layout and quote show the frame, deck and access scope. Review future additions before settling the first footprint.

    4

    Prepare delivery

    Agree component staging and receiving access around the facility schedule. Keep truck movements in view when choosing the delivery arrangement.

    5

    Manage assembly

    Experienced installation crews we schedule and manage assemble the system. Your project contact coordinates the agreed work sequence and handoff.

    Price the Platform Around Your Lease Plans

    Review the Detroit warehouse-space overviewor the needs of Troy supplier facilities, then share the area available inside your building. For the working uses of a deck, see our mezzanine systems guide. Call (888) 553-7276 to discuss a layout and scope.

    We respect your privacy. Your information will never be shared.

    Lease, Height and Future Expansion Questions

    Free-Standing Platforms Across the Service Territory

    Talk With Our Team in Troy

    Bring your lease and space-planning priorities to a discussion with Detroit Mezzanines.

    Detroit Mezzanines

    Address

    100 West Big Beaver Road
    Suite 200, Unit L
    Troy, MI 48084

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Plan a Level That Can Change With the Operation

    Discuss the first footprint alongside the next lease, additional bay or possible move.

    (888) 553-7276
    Call Now